Search This Blog

Saturday 26 August 2023

Cumbrae Slip/ Challenger of Leith





The current slip, which was built in the 1970s, is now deteriorating and CMAL is looking to rebuild the structure 'Two options have been put to islanders, with the first to revamp the existing double width slipway in its current position and build a temporary slipway to maintain service during construction.

The second option is to build a new double width slipway around 25 metres south of the existing structure and transfer services to this once construction is complete.

No comments: