RFA Tideforce



 Tideforce, along with her three sister ships, was built by DSME in South Korea. As the fourth and final Tide-class vessel, her steel was first cut on 2 December 2015 prior to being laid down on 24 December 2015. Around nine months later, the ship was fully assembled and floated out by 12 September 2016. A series of builder's sea trials subsequently commenced and, in June 2018, the ship left South Korea for delivery to the United Kingdom via San Diego and the Panama Canal. The ship arrived in Falmouth for fitting out on 22 August 2018. This involved the installation of communications equipment, defensive systems, a floating helipad and refueling rigs. Following fitting out, the ship carried out capability assessment trials, replenishment at sea (RAS) trials and first-of-class flying trials.