Search This Blog

Monday 17 March 2014

Sound of Soay






Sound of Soay making her way to Gourock on a dark and windy afternoon.

Sunday 16 March 2014

Coruisk




CalMac's Courisk, which has been operating sailings on Argyll Ferries's Gourock to Dunoon passenger route collided with the piet at Dunoon on the 11 March 2014.
Her bow was damaged and was removed at James Watt Dock and taken to Fergusons shipbuilders for repair.

Forth Sentinal,Forth Jouster,Forth Gaurdsman.








Forth Sentinal,Forth Jouster,Forth Gaurdsman seen in James Watt Dock before seting off for the Isle of Arran to lay cables.

Friday 14 March 2014

Westway Dock, River Cart












Westway Dock on the River Cart being dredged so that Steel Engineering can move larger loads down the Cart into the Clyde.

At work are the tugs Coastrunner, Regis 2 and Split-Hopper-Barge B303.


Thursday 13 March 2014

Beaver Bay


Clyde Marines tug Beaver Bay seen at Ardrossan Harbour.

Monday 10 March 2014

Sunday 9 March 2014

Inchgreen Drydock





Inchgreen Drydock in Greenock is being used for construction of a ferry berthing extension for Ullapool Pier.
The 33-metre structure when built will be towed to the harbour .
The decision to build off site at Inchgreen  means  the ferry service can be maintained.

The extension is needed because the new 116-metre CalMac ferry MV Loch Seaforth which is due to arrive in August 2014  will replace the current ferry MV Isle of Lewis.

Saturday 8 March 2014

Puncher




Clyde Marines general service launch Puncher ,in the top pictures  she is seen acting as a line runner.

Thursday 6 March 2014

Valkyrie





Multi-purpose GRP-hulled research vessel built by Catapult Catamarans Marine project Limited of Southampton for Fugro EMU Limited of Southampton based on their Type 12 M CATAPULT 396 design. 12 metres x 4.8 metres and drawing around 1.1 metre depth. Tonnage approximately 17 tonnes.