Search This Blog
Thursday 7 October 2010
Tuesday 5 October 2010
HNoMS Ula S 300
The Ula class is a Norwegian submarine type which was assembled in Germany in the late 1980s and early 1990s. The class, consisting of 6 vessels, is currently the only submarine type in service with the Royal Norwegian Navy.
The Ula class submarines are among the most silent and maneuverable submarines in the world. This, in combination with the relatively small size, makes them difficult to detect from surface vessels and ideal for operations in coastal areas. The Ula class submarines are regarded as both the most effective and cost-effective weapons in the RNoN.
Information courtesy of wikipedia
Monday 4 October 2010
HMS Echo
HMS Echo is the first of two multi-role hydrographic survey ships commissioned by the Royal Navy. With her sister ship, HMS Enterprise, they form the Echo class of survey vessels. She was built by Appledore Shipbuilders in Devon in 2002 and is the ninth Royal Navy vessel to carry the name.
Echo and Enterprise are the first Royal Navy ships to be fitted with azimuth thrusters. Both azimuth thrusters and the bow thruster can be controlled through the Integrated Navigation System by a joystick providing high manoeuvrability. Complete control and monitoring for power generation and propulsion, together with all auxiliary plant systems, tank gauging and damage control functions is provided through the Integrated Platform Management System (IPMS), accessible through workstations around the ship.
Echo and her sister ship are designed to conduct survey operations in support of submarines or amphibious operations. She can provide almost real-time tailored environmental information, and also has a secondary role as a Mine Countermeasure Tasking Authority platform, for which she is capable of embarking a dedicated Mine Counter Measures command team.
Information courtesy of wikipedia
Sunday 3 October 2010
Leroy Grumman T AO 195
Leroy Grumman, the ninth ship of the Henry J. Kaiser class and first U.S. Navy ship to bear the name, was laid down at Avondale Shipyard, Inc., at New Orleans, Louisiana, on 6 July 1987 and launched on 3 December 1988. She entered non-commissioned U.S. Navy service under the control of the Military Sealift Command with a primarily civilian crew on 2 August 1989.
Friday 1 October 2010
Subscribe to:
Posts (Atom)