Thursday, 30 January 2025
Wednesday, 29 January 2025
Sound of Soay
The Sound of Soay making her way to Dunoon, in the background is the Hebridean Princess in the Holy Loch.
Saturday, 25 January 2025
Thursday, 23 January 2025
Wednesday, 22 January 2025
Tuesday, 21 January 2025
INVERARAY Bridge Repairs
The project will involve dismantling and repairing three damaged sections of the seawall, with a focus on salvaging and reusing as much of the original material as possible. Key improvements will include installing guttering, repairing the concrete haunch, and extending this where necessary. These upgrades aim to strengthen the wall’s resilience, safeguarding the A83 from the damaging effects of wave action and harsh coastal conditions.
Monday, 20 January 2025
Saturday, 18 January 2025
Cherry Sand
Cherry Sand at Ayr harbour.
The hopper is fitted with a grid to avoid debris being deposited at sea, and discharges via hydraulically operated bottom doors.
Wednesday, 15 January 2025
MV Portree
MV Portree was a ferry, built in 1965 for the Skye crossing. In 1970, she was re-built and moved to the Kyles of Bute where she served until 1986.
Tuesday, 14 January 2025
Monday, 13 January 2025
Sunday, 12 January 2025
Friday, 10 January 2025
Wednesday, 8 January 2025
Monday, 6 January 2025
MV Loch Nevis
MV Loch Nevis at Troon Harbour, she was in at Dales drydock for her annual maintenance check.
MV Lochnevis, Loch Nibheis in Gaelic, serves the Small Isles of Canna, Eigg, Muck and Rum from Mallaig.
Built at Ailsa Shipbuilding, Troon on 6 May 2000 and entered service on 1 November 2001.




























